We Hae Meat Factory extension Girvan
We were contracted by We Hae Meat to design the extension to their existing factory for which we had obtained planning permission and building warrant approval in 2005.
The proposal was to increase the size of the factory by 3 to allow for the 24hour operation to be able to meet the growing business demand. We prepared initial sketches from which finalised designs were agreed upon.
There were lengthy discussions with South Ayrshire Building Control to finalise the fire strategy and design required to meet stringent fire escape regulations.
The factory was constructed by 3B and has now been completed.